* Please refer to the English Version as our Official Version.
Part Number
1206J1000333MXTE03
Manufacturer
Description
CERAMIC CAP
Datasheet
Package
1206 (3216 Metric)
In Stock
8,244 piece(s)
Unit Price
Request a Quote
Lead Time
To be Confirmed
Estimated Delivery Time
Dec 29 - Jan 3 ( Choose Expedited Shipping)
Request for Quotation
Heisener's commitment to quality has shaped our processes for sourcing, testing, shipping, and every step in between. This foundation underlies each component we sell.
Do you have any question about 1206J1000333MXTE03?
+86-755-83210559-836
Part Number # 1206J1000333MXTE03 (Ceramic Capacitors) is manufactured by Knowles Syferand distributed by Heisener. Being one of the leading electronics distributors, we carry many kinds of electronic components from some of the world’s top class manufacturers. Their quality is guaranteed by its stringent quality control to meet all required standards.
For 1206J1000333MXTE03specifications/configurations, quotation, lead time, payment terms of further enquiries please have no hesitation to contact us. To process your RFQ, please add 1206J1000333MXTE03 with quantity into BOM. Heisener.com does NOT require any registration to request a quote of 1206J1000333MXTE03.
Wint*****oran
April 7, 2023
Bost*****ebert
April 5, 2023
Galil*****okshi
April 2, 2023
Aid*****Black
March 21, 2023
Fra*****s Sem
March 19, 2023
Aria*****eron
March 19, 2023
Quin*****Noble
March 12, 2023
Franci*****lentine
March 3, 2023
Rodne*****nklin
February 22, 2023
Currently, Heisener only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market,
and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test the1206J1000333MXTE03. All suppliers must pass our qualification reviews before they can publish their products including 1206J1000333MXTE03 on Heisener;we pay more attention to the channels and quality of 1206J1000333MXTE03products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the 1206J1000333MXTE03 price and inventory displayed accurate?The price and inventory of 1206J1000333MXTE03 fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment.
If there is something wrong with the 1206J1000333MXTE03 we delivered, we will accept the replacement or return of the 1206J1000333MXTE03 only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery of1206J1000333MXTE03.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
We guarantee 100% customer satisfaction.
Our experienced sales team and tech support team back our services to satisfy all our customers.
We provide 90 days warranty.
If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.
Part Number | Manufacturer | Description | Stock |
1206J1000333MXTE03 D# 1206J1000333MXTE03-ND |
Syfer Technology |
CAP CER 0.033UF 100V X7R 1206 |
0 |
LED RED CLEAR 2PLCC SMD
CAP CER DISC RADIAL
IC FLASH 8MBIT 80MHZ 8SOIC
OSC MEMS 48.000MHZ CMOS SMD
CRYSTAL 24MHZ 8PF SMD
IC TXRX RS485/422 10MBPS 14SOIC
TVS DIODE 28.2VWM 45.7VC AXIAL
IGBT 600V 200A 660W TO247
IC MCU 8BIT 32KB FLASH 28SOIC
IC CLOCK GEN 1.25GHZ VCO 72LFCSP
SIT8208AC-GF-28E-16.367667Y
SiTime, -20 TO 70C, 2520, 10PPM, 2.8V, 17X-76.800MBD-T
TXC CORPORATION, OSC XO 76.80MHZ CMOS SMDBFC241806804
Vishay BC Components, CAP FILM 0.68UF 5% 250VDC RADIALVJ0402D6R8DLAAC
Vishay Vitramon, CAP CER 6.8PF 50V C0G/NP0 0402SEK470M025ST
Cornell Dubilier Electronics (CDE), CAP ALUM 47UF 20% 25V RADIALSMLJ51AE3/TR13
Microsemi Corporation, TVS DIODE 51VWM 82.4VC SMCJ951404-9062506-AR
3M, CONN HDR STR STACK 4POS 2MM T/HFH12-45S-0.5SH(55)
Hirose Electric Co Ltd, CONN FFC BOTTOM 45POS 0.50MM R/ADTS20W17-26PB-LC
TE Connectivity Deutsch Connectors, CONN RCPT HSNG MALE 26POS PNL MTAMM18DRMT
Sullins Connector Solutions, CONN EDGE DUAL FMALE 36POS 0.1569284R/B
E-Z-Hook, BANANA JACK PNL MT SET/2 RED/BLKXC9235B17D0R-G
Torex Semiconductor Ltd, 600MA SYNCHRONOUS STEP-DOWN DCDC