Part Number
2A1909-10
Manufacturer
Description
KIT MAIN CP LUG 3 PHASE 30-60A
Datasheet
Package
-
In Stock
7,938 piece(s)
Unit Price
Request a Quote
Lead Time
To be Confirmed
Estimated Delivery Time
Nov 7 - Nov 12 ( Choose Expedited Shipping)
Request for Quotation
Heisener's commitment to quality has shaped our processes for sourcing, testing, shipping, and every step in between. This foundation underlies each component we sell.
Do you have any question about 2A1909-10?
+86-755-83210559 ext. 813
Part Number # 2A1909-10 (Accessories) is manufactured by Eatonand distributed by Heisener. Being one of the leading electronics distributors, we carry many kinds of electronic components from some of the world’s top class manufacturers. Their quality is guaranteed by its stringent quality control to meet all required standards.
For 2A1909-10specifications/configurations, quotation, lead time, payment terms of further enquiries please have no hesitation to contact us. To process your RFQ, please add 2A1909-10 with quantity into BOM. Heisener.com does NOT require any registration to request a quote of 2A1909-10.
Amir*****ffer
April 1, 2023
Salm*****nitez
March 25, 2023
Bridg*****lendez
March 14, 2023
Brae***** Ellis
March 14, 2023
Ibra*****Halder
March 9, 2023
Gise*****Kirk
March 1, 2023
Currently, Heisener only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market,
and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test the2A1909-10. All suppliers must pass our qualification reviews before they can publish their products including 2A1909-10 on Heisener;we pay more attention to the channels and quality of 2A1909-10products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the 2A1909-10 price and inventory displayed accurate?The price and inventory of 2A1909-10 fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment.
If there is something wrong with the 2A1909-10 we delivered, we will accept the replacement or return of the 2A1909-10 only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery of2A1909-10.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
We guarantee 100% customer satisfaction.
Our experienced sales team and tech support team back our services to satisfy all our customers.
We provide 90 days warranty.
If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.
Part Number | Manufacturer | Description | Stock |
2A1909-10 D# 2A1909-10 |
Eaton Corporation |
KIT MAIN CP LUG 3 PHASE 30-60A - Bulk (Alt: 2A1909-10) RoHS: Not Compliant
|
0 |
Part Number | Manufacturer | Description | Stock |
2A1909-10 D# 2A1909-10-ND |
Eaton Bussmann |
KIT MAIN CP LUG 3 PHASE 30-60A |
0 |
Part Number | Manufacturer | Description | Stock |
2A1909-10 |
Eaton Corporation |
RoHS: Compliant
pbFree: Yes
|
0 |
Part Number | Manufacturer | Description | Stock |
2A1909-10 D# 000000000003483842 |
Eaton Bussmann |
Fuse Holder Kit, Main CP lug 3 phase 30-60A |
0 |
IC MOTOR CONTROLLER PAR 44PLCC
IGBT 1200V 40A 180W TO263
CONN RCPT USB TYPE B
DIODE SCHOTTKY 60V 3A DO201AD
BAROMETRIC PRESSURE SENSOR
CONN HEADER 10POS .100 STR 15AU
IC RS485/RS422 DATA INTRFC 24DIP
IC OPAMP VF R-R LDIST LP SOT23-5
IC LOAD SW HISIDE 3A 4-MLF
IC MULTIPLEXER 1X16 32LFCSP
06033J0R9ABTTR
AVX Corporation, CAP THIN FILM 0.9PF 25V 06030505J0639P10CQT
Knowles Syfer, CAP CER 9.1PF 63V C0G/NP0 05057737NAB+U622
APEM Inc., SWITCH ROCKER SPDT 6A 125VUB15RKG035C-CC
NKK Switches, SWITCH PUSHBUTTON SPDT 0.4VA 28V1883300000
Weidmuller, TERM BLOCK HDR 38POS VERT 5MMACT96WE99SA
TE Connectivity Deutsch Connectors, CONN PLUG 23POS STRGHT W/SKTMS27467T15F97P
Amphenol Aerospace Operations, CONN PLUG 12POS STRAIGHT W/PINSC48-16R18-14S8-106
Cinch Connectivity Solutions, CONN PLUG HSG FMALE 14POS INLINERSM22DSUN
Sullins Connector Solutions, CONN EDGE DUAL FMALE 44POS 0.156SSQL48T15033-PAB0G
Bel Power Solutions, DC/DC CONVERTER 3.3V 50WVI-BNZ-IX-F2
Vicor Corporation, CONVERTER MOD DC/DC 2V 30WLTC2936IGN
Linear Technology, IC SUPERVISOR