Part Number
2A1909-11
Manufacturer
Description
KIT MAIN MECHANICAL LUG 3 PHASE
Datasheet
Package
-
In Stock
7,038 piece(s)
Unit Price
Request a Quote
Lead Time
To be Confirmed
Estimated Delivery Time
Jan 5 - Jan 10 ( Choose Expedited Shipping)
Request for Quotation
Heisener's commitment to quality has shaped our processes for sourcing, testing, shipping, and every step in between. This foundation underlies each component we sell.
Do you have any question about 2A1909-11?
+86-755-83210559 ext. 807
Part Number # 2A1909-11 (Accessories) is manufactured by Eatonand distributed by Heisener. Being one of the leading electronics distributors, we carry many kinds of electronic components from some of the world’s top class manufacturers. Their quality is guaranteed by its stringent quality control to meet all required standards.
For 2A1909-11specifications/configurations, quotation, lead time, payment terms of further enquiries please have no hesitation to contact us. To process your RFQ, please add 2A1909-11 with quantity into BOM. Heisener.com does NOT require any registration to request a quote of 2A1909-11.
Salv***** Dutt
March 26, 2023
Kay***** Buch
March 21, 2023
Kai*****aran
March 11, 2023
Alisa*****ussen
March 4, 2023
Mic*****Kant
March 2, 2023
Brenn*****havan
February 27, 2023
Corb*****ierra
February 24, 2023
Currently, Heisener only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market,
and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test the2A1909-11. All suppliers must pass our qualification reviews before they can publish their products including 2A1909-11 on Heisener;we pay more attention to the channels and quality of 2A1909-11products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the 2A1909-11 price and inventory displayed accurate?The price and inventory of 2A1909-11 fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment.
If there is something wrong with the 2A1909-11 we delivered, we will accept the replacement or return of the 2A1909-11 only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery of2A1909-11.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
We guarantee 100% customer satisfaction.
Our experienced sales team and tech support team back our services to satisfy all our customers.
We provide 90 days warranty.
If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.
Part Number | Manufacturer | Description | Stock |
2A1909-11 D# 2A1909-11 |
Eaton Corporation |
KIT MAIN MECHANICAL LUG 3 PHASE 30-60A - Bulk (Alt: 2A1909-11) RoHS: Not Compliant
|
0 |
Part Number | Manufacturer | Description | Stock |
2A1909-11 D# 2A1909-11-ND |
Eaton Bussmann |
KIT MAIN MECHANICAL LUG 3 PHASE |
0 |
Part Number | Manufacturer | Description | Stock |
2A1909-11 |
Eaton Corporation |
RoHS: Compliant
pbFree: Yes
|
0 |
Part Number | Manufacturer | Description | Stock |
2A1909-11 D# 000000000003483843 |
Eaton Bussmann |
Circuit Breaker Accessories Kit, Main Mech lug 3 phase 30-60A |
0 |
INSERT MALE 40POS+1GND CRIMP
IC REG BUCK ADJ 4A QD SYNC 77BGA
IC MOTOR DRIVER PAR MFP10S
Decodes both full HD MPEG-2 and H.264
TRANS PNP 100V 1A SOT23-3
IC ADC 12BIT 8CH 456KSPS 48LQFP
IC RF POWER AMP 2170MHZ 16-PFP
DIODE GEN PURP 80V 100MA UMD2
IC FLASH NOR 8SOIC
IC MCU 8BIT 8KB FLASH 14SOIC
2225Y3K00470KCR
Knowles Syfer, CAP CER 2225BZD27C11P-M-08
Vishay Semiconductor Diodes Division, DIODE ZENER 800MW SMF DO219-MMKRAWT-02-0000-0D00H4051
Cree Inc., LED XLAMP COOL WHITE 6200K 2SMDSPMWH2228MD5WAUMS1
Samsung, LED LM281B+RN65C2341FB14
Vishay Dale, RES 2.34K OHM 1/2W 1% AXIAL9T06031A7691BBHFT
Yageo, RES SMD 7.69KOHM 0.1% 1/10W 0603ERJ-PA3J432V
Panasonic Electronic Components, RES SMD 4.3K OHM 5% 1/4W 0603SFH6135-X019
Vishay Semiconductor Opto Division, OPTOISO 5.3KV TRANS W/BASE 8SMDESQT-113-02-M-D-463
Samtec Inc., ELEVATED 2MM SOCKETSDW-12-19-G-D-1020
Samtec Inc., .025" BOARD SPACERSM83723/74R16249
TE Connectivity Deutsch Connectors, CONN RCPT 24POS JAM NUT W/PINSD38999/26WJ11AC
Amphenol Aerospace Operations, CONN PLUG HSNG MALE 11POS INLINE