Part Number
G2SBA20-E3/45
Manufacturer
Description
DIODE GPP 1.5A 200V GBL
Datasheet
Package
4-SIP, GBL
In Stock
4,800 piece(s)
Unit Price
Request a Quote
Lead Time
To be Confirmed
Estimated Delivery Time
Nov 11 - Nov 16 ( Choose Expedited Shipping)
Request for Quotation
Heisener's commitment to quality has shaped our processes for sourcing, testing, shipping, and every step in between. This foundation underlies each component we sell.
Do you have any question about G2SBA20-E3/45?
+86-755-83210559-827
Part Number # G2SBA20-E3/45 (Diodes - Bridge Rectifiers) is manufactured by Vishay Semiconductor Diodes Divisionand distributed by Heisener. Being one of the leading electronics distributors, we carry many kinds of electronic components from some of the world’s top class manufacturers. Their quality is guaranteed by its stringent quality control to meet all required standards.
For G2SBA20-E3/45specifications/configurations, quotation, lead time, payment terms of further enquiries please have no hesitation to contact us. To process your RFQ, please add G2SBA20-E3/45 with quantity into BOM. Heisener.com does NOT require any registration to request a quote of G2SBA20-E3/45.
West*****Bose
April 6, 2023
Justi*****dwell
April 4, 2023
Bent*****Pace
April 2, 2023
Ari*****asa
March 9, 2023
Evely*****ntyre
February 26, 2023
Zoi*****ise
February 26, 2023
Hal*****Bora
February 24, 2023
Currently, Heisener only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market,
and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test theG2SBA20-E3/45. All suppliers must pass our qualification reviews before they can publish their products including G2SBA20-E3/45 on Heisener;we pay more attention to the channels and quality of G2SBA20-E3/45products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the G2SBA20-E3/45 price and inventory displayed accurate?The price and inventory of G2SBA20-E3/45 fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment.
If there is something wrong with the G2SBA20-E3/45 we delivered, we will accept the replacement or return of the G2SBA20-E3/45 only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery ofG2SBA20-E3/45.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
We guarantee 100% customer satisfaction.
Our experienced sales team and tech support team back our services to satisfy all our customers.
We provide 90 days warranty.
If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.
Part Number | Manufacturer | Description | Stock |
G2SBA20-E3/45 |
Vishay Semiconductors |
RECTFR BRIDGE SGL 200V 1.5A 4PIN CASE GBL - Rail/Tube |
0 |
Part Number | Manufacturer | Description | Stock |
G2SBA20-E3/45 D# G2SBA20-E3/45-ND |
Vishay Semiconductors |
BRIDGE RECT 1PHASE 200V 1.5A GBL |
0 |
Part Number | Manufacturer | Description | Stock |
G2SBA20-E3/45 D# NS-G2SBA20-E3/45 |
Vishay Semiconductors |
OEM/CM ONLY |
7993 |
IC REG LINEAR POS ADJ 50MA 8MSOP
TVS DIODE 3.3VWM 8.8VC 10MSOP
MOSFET P-CH 100V 38A D2PAK
IC MPU MPC83XX 266MHZ 369BGA
IC REG CTRLR BUCK 10UMAX
PHOTOCOUPLER RELAY SSR 8-SMD
IC ADC 12BIT SRL LP W/REF 8-SOIC
IC FLASH 16MBIT 80MHZ 8WSON
SWITCH TACTILE SPST-NO 0.02A 15V
DIODE SBR 60V 3A POWERDI123
0603YC103KA19A
AVX Corporation, CAP CER 10000PF 16V X7R 0603HHXB160ARA820MF61G
United Chemi-Con, CAP ALUM POLY HYB 82UF 16V SMDMAX809LEUR-T
Maxim Integrated, IC MPU RESET CIRC 4.63V SOT23TPS3307-33DRG4
Texas Instruments, IC 5/3.3V/ADJ TRPL MONIT 8-SOIC48ASSP1S1M6RAT
Grayhill Inc., SWITCH SLIDE SPDT 0.4VA 20VCMF553M0100FKEK
Vishay Dale, RES 3.01M OHM 1/2W 1% AXIALRNCF1210BTC232R
Stackpole Electronics Inc., RES SMD 232 OHM 0.1% 1/3W 121089639-402HLF
Amphenol FCI, HEADER BERGSTIK158210-0320
3M, 2MM RIBBON CABLE SOCKET 10 POSCG16.5101.151
Schurter Inc., PWR ENT MOD RCPT IEC320-C14 PNLMS3471L24-19S
TE Connectivity Deutsch Connectors, CONN RCPT 19POS INLINE SCKTD38999/26ZD19HD
Amphenol Aerospace Operations, CONN PLUG MALE 19POS GOLD CRIMP