Part Number
LC02FBR-PUR
Manufacturer
Description
M12-M12 4P R/A PUR CBL SHTH 2M
Datasheet
Package
-
In Stock
4,554 piece(s)
Unit Price
Request a Quote
Lead Time
To be Confirmed
Estimated Delivery Time
Dec 31 - Jan 5 ( Choose Expedited Shipping)
Request for Quotation
Heisener's commitment to quality has shaped our processes for sourcing, testing, shipping, and every step in between. This foundation underlies each component we sell.
Do you have any question about LC02FBR-PUR?
+86-755-83210559 ext. 803
Part Number # LC02FBR-PUR (Accessories) is manufactured by Cynergy 3and distributed by Heisener. Being one of the leading electronics distributors, we carry many kinds of electronic components from some of the world’s top class manufacturers. Their quality is guaranteed by its stringent quality control to meet all required standards.
For LC02FBR-PURspecifications/configurations, quotation, lead time, payment terms of further enquiries please have no hesitation to contact us. To process your RFQ, please add LC02FBR-PUR with quantity into BOM. Heisener.com does NOT require any registration to request a quote of LC02FBR-PUR.
Barb*****Morgan
March 13, 2023
Sele*****oshi
February 26, 2023
Currently, Heisener only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market,
and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test theLC02FBR-PUR. All suppliers must pass our qualification reviews before they can publish their products including LC02FBR-PUR on Heisener;we pay more attention to the channels and quality of LC02FBR-PURproducts than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the LC02FBR-PUR price and inventory displayed accurate?The price and inventory of LC02FBR-PUR fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment.
If there is something wrong with the LC02FBR-PUR we delivered, we will accept the replacement or return of the LC02FBR-PUR only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery ofLC02FBR-PUR.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
We guarantee 100% customer satisfaction.
Our experienced sales team and tech support team back our services to satisfy all our customers.
We provide 90 days warranty.
If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR |
Cynergy3 Components |
Lead time 42 |
5 |
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR D# 725-1259-ND |
Cynergy3 Components |
M12-M12 4P R/A PUR CBL SHTH 2M |
0 |
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR D# CYNLC02FBR-PUR |
Cynergy3 Components |
CABLE PUR WITH ELBOW M12-2M |
0 |
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR D# NS-LC02FBR-PUR |
Cynergy3 Components |
OEM/CM ONLY |
3917 |
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR D# 7800374 |
Cynergy3 Components |
Cynergy3 M12 Cable Set For Use With Liquid Level Sensors, EA Min Qty: 1
Container: Bulk
|
9 |
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR D# 000000000006096456 |
Cynergy3 Components |
CABLE PUR WITH ELBOW M12 CONNECTOR 2M |
5 |
Part Number | Manufacturer | Description | Stock |
LC02FBRPUR |
CYNERGY3 COMPONENTS LTD |
OEM/CM ONLY |
105 |
Part Number | Manufacturer | Description | Stock |
LC02FBR-PUR |
Sensata Technologies |
Sensor Hardware & Accessories CABLES pbFree: Pb-Free
|
0 |
DIODE ZENER 13V 500MW SOD123
DIODE SCHOTTKY 40V SOD123
IC LED DRIVER 5-CH CMOS 20-DIP
MOSFET P-CH 30V 3.6A SOT-23-3
SWITCH TACTILE SPST-NO 0.05A 24V
CAP CER DISC RADIAL
INSERT MALE 40POS+1GND CRIMP
FIXED IND 100UH 510MA 600 MOHM
IC REG LIN 2.5V 150MA TSOT23-5
CONN HEADER PH TOP 5POS 2MM
XC6122C336MR-G
Torex Semiconductor Ltd, IC WATCHDOG TIMER SOT-25SN7432N
Texas Instruments, IC GATE OR 4CH 2-INP 14-DIPEPM7128STC100-10
Altera, IC CPLD 128MC 10NS 100TQFPMPR3PGTW12.0
Bivar Inc., LED PANEL INDICATOR GRN 2.2VJW80ZT0R00
Stackpole Electronics Inc., RES 0.0 OHM 4A JUMP AXIALAC0805JR-075M6L
Yageo, RES SMD 5.6M OHM 5% 1/8W 0805FTR-124-55-T-S
Samtec Inc., SMT .050'' STRIPSL777HDA26PVFM
Amphenol Commercial Products, CONN D-SUB HD PLUG 26POS STRD38999/26MA98PN
Amphenol Aerospace Operations, CONN PLUG 3POS STRAIGHT W/PINSVE-25H-MU-B1
Vicor Corporation, CONVERTER MOD DC/DC 52V 200WVI-2TK-IV-F2
Vicor Corporation, CONVERTER MOD DC/DC 40V 150WXC6129N15C9R-G
Torex Semiconductor Ltd, VOLTAGE DETECTOR WITH DELAY TIME