* Please refer to the English Version as our Official Version.
Part Number
SMZJ3789B-M3/5B
Manufacturer
Description
DIODE ZENER 10V 1.5W DO214AA
Package
DO-214AA, SMB
In Stock
7,344 piece(s)
Unit Price
Request a Quote
Lead Time
To be Confirmed
Estimated Delivery Time
Feb 6 - Feb 11 ( Choose Expedited Shipping)
Request for Quotation
Heisener's commitment to quality has shaped our processes for sourcing, testing, shipping, and every step in between. This foundation underlies each component we sell.
Do you have any question about SMZJ3789B-M3/5B?
+86-755-83210559 ext. 816
Part Number # SMZJ3789B-M3/5B (Diodes - Zener - Single) is manufactured by Vishay Semiconductor Diodes Divisionand distributed by Heisener. Being one of the leading electronics distributors, we carry many kinds of electronic components from some of the world’s top class manufacturers. Their quality is guaranteed by its stringent quality control to meet all required standards.
For SMZJ3789B-M3/5Bspecifications/configurations, quotation, lead time, payment terms of further enquiries please have no hesitation to contact us. To process your RFQ, please add SMZJ3789B-M3/5B with quantity into BOM. Heisener.com does NOT require any registration to request a quote of SMZJ3789B-M3/5B.
Simo*****uang
March 28, 2023
Kinl*****ardy
March 25, 2023
Gene*****Kline
March 18, 2023
Luka*****irre
March 13, 2023
Raid*****hort
March 11, 2023
Camr*****ucas
March 9, 2023
Alla*****cobson
March 9, 2023
Bry***** Hunt
February 21, 2023
Currently, Heisener only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market,
and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test theSMZJ3789B-M3/5B. All suppliers must pass our qualification reviews before they can publish their products including SMZJ3789B-M3/5B on Heisener;we pay more attention to the channels and quality of SMZJ3789B-M3/5Bproducts than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the SMZJ3789B-M3/5B price and inventory displayed accurate?The price and inventory of SMZJ3789B-M3/5B fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment.
If there is something wrong with the SMZJ3789B-M3/5B we delivered, we will accept the replacement or return of the SMZJ3789B-M3/5B only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery ofSMZJ3789B-M3/5B.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
We guarantee 100% customer satisfaction.
Our experienced sales team and tech support team back our services to satisfy all our customers.
We provide 90 days warranty.
If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.
Part Number | Manufacturer | Description | Stock |
SMZJ3789B-M3/5B D# SMZJ3789B-M3/5B |
Vishay Intertechnologies |
1.5W,10V 5%,SMB ZENER (Alt: SMZJ3789B-M3/5B) |
0 |
Part Number | Manufacturer | Description | Stock |
SMZJ3789B-M3/5B D# SMZJ3789B-M3/5B-ND |
Vishay Semiconductors |
DIODE ZENER 10V 1.5W DO214AA |
0 |
TRANS PNP 80V 1.5A SOT-223
CONN HEADER PH TOP 6POS 2MM SMD
OPTOISO 5.3KV 2CH OPEN DRN 8SMD
RES ARRAY 7 RES 3.3K OHM 8SIP
OPTOISO 3.75KV PUSH PULL 5SO
IC REG LINEAR 2.5V 150MA SOT25
CAP 11MF 3.3V SURFACE MOUNT
DIODE ZENER 4.7V 300MW SOD323
IC OPAMP GP 14KHZ RRO 8SOIC
CRYSTAL 26.0000MHZ 10PF SMD
501KBD-ADAF
Silicon Labs, OSC PROG LVCMOS 2.5V EN/DS 30PPMPA1367NL
Pulse Electronics Power, XFMR FORWARD EP13 SM 10 PIN0663.080HXSL
Littelfuse Inc., FUSE BOARD MOUNT 80MA 250VAC RADG2R-1A-E DC110
Omron Electronics Inc-EMC Div, RELAY GEN PURPOSE SPST 16A 110VT73YP503KT20
Vishay Sfernice, TRIMMER 50K OHM 0.5W THNUC8
Eaton, COVER FOR TERM BLK KU8174/GRL
Greenlee Communications, WIRE FERL INSULPBC10DADN
Sullins Connector Solutions, CONN HEADER .100 DUAL STR 20POSFW-41-03-G-D-163-090
Samtec Inc., .050'' BOARD SPACERSEW-07-13-T-D-820
Samtec Inc., .025" BOARD SPACERSMS3474L20-39PY
Amphenol Aerospace Operations, CONN RCPT 39POS JAM NUT W/PINSECA50DTAZ-S273
Sullins Connector Solutions, CONN EDGE DUAL FMALE 100POS .125